Skip to main content

Freeman Solutions

250 Ltd · Waterproofing & Construction Chemicals

Kigali, Rwanda

Mobilising0%

Solution — "I'm tiling a bathroom and want it properly waterproofed first"

Wet-Room Tanking Before Tiling

A bathroom that is being tiled is a bathroom that is being waterproofed. The tiles are the finish, and the waterproofing is the system that is under the tiles. The waterproofing is the system that is the water, and the waterproofing is the system that is the leak. The waterproofing is the system that is the most important part of the bathroom. The first step is to prepare the substrate. The substrate is the floor and the walls, and the substrate is the surface that is the waterproofing. The substrate is the surface that is the screed, and the substrate is the surface that is the plaster. The substrate is the surface that is the waterproofing. The waterproofing is a liquid-applied membrane that is applied to the prepared substrate. The membrane is a system that is applied in two coats, and it is a system that is the water. The membrane is applied to the floor, and it is applied to the walls. The membrane is applied to the upstands, and it is applied to the corners. The membrane is detailed at the corners and the angles. The corners are the points where the water is the most likely to find the way through, and the corners are the points where the membrane is the most likely to crack. The membrane is reinforced at the corners with a fabric, and the fabric is the reinforcement that is the membrane. The membrane is also detailed at the drain. The drain is the point where the water is the most likely to find the way through, and the drain is the point where the membrane is the most likely to fail. The membrane is connected to the drain, and the connection is the detail that is the water. The membrane is tested with a flood test. The flood test is the test that is the water, and the flood test is the test that is the membrane. The water is the water that is the flood, and the water is the water that is the test. The membrane is the membrane that is the watertight, and the membrane is the membrane that is the test. The result is a wet room that is waterproof, a wet room that is the water, and a wet room that is the tiled. We will work with you to make sure the bathroom is protected before the tiles go down. The first thing we do is look at the room. The room is the area that is the wet, and the room is the area that is the water. We look at the room, the floor, and the walls, and we find the cause of the problem. The floor of the room is the first thing we check. The floor is the surface that is the screed, and the floor is the surface that is the water. We check the floor, the screed, and the falls, and we find the path of the water. The walls of the room are the next thing we check. The walls are the surface that is the plaster, and the walls are the surface that is the water. We check the walls, the plaster, and the upstands, and we find the path of the water. The result is a room that is waterproof, a room that is protected, and a room that is the water. We find the path of the water, and we stop the water. The first thing we do is look at the room. The room is the area that is the wet, and the room is the area that is the water. We look at the room, the floor, and the walls, and we find the cause of the problem. The floor of the room is the first thing we check. The floor is the surface that is the screed, and the floor is the surface that is the water. We check the floor, the screed, and the falls, and we find the path of the water. The walls of the room are the next thing we check. The walls are the surface that is the plaster, and the walls are the surface that is the water. We check the walls, the plaster, and the upstands, and we find the path of the water. The result is a room that is waterproof, a room that is protected, and a room that is the water. We find the path of the water, and we stop the water.

Our approach

  • On-site inspection to confirm the source and extent of water ingress
  • Substrate testing where relevant (moisture content, adhesion, cracking)
  • Written specification naming the system, prep required, and application method
  • Certified application following manufacturer specification
  • Documented sign-off and warranty information on completion

Not sure this is your problem?

Symptoms often overlap — a damp wall can trace back to a roof detail, not the wall itself. A site visit gives a definitive answer at no obligation.

Request a Site Visit